Voyage estimate
Suezmax voyage: Angra dos Reis to Long Beach
A Suezmax carrying 130,000 tonnes from Angra dos Reis to Long Beach sails about 8,201 nm laden via the Strait of Magellan, about 27.3 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 55.0 days and burns about 1,975 tonnes of fuel.
Round voyage
55.0 d
27.3 d laden
Laden distance
8,201 nm
Avoiding the Panama Canal
Fuel (VLSFO)
1,975 t
Round voyage
CO2
6,222 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Angra dos Reis → Long Beach | 8,201 nm | 12.5 kn | 27.3 | 1,094 t |
Ballast Long Beach → Angra dos Reis | 7,386 nm | 13 kn | 23.7 | 781 t |
Port time Loading and discharge | — | — | 4.0 | 100 t |
| Round voyage | 15,588 nm | 55.0 | 1,975 t |
Laden via the Strait of Magellan; ballast via the Panama Canal.
A laden Suezmax draws about 17 m, deeper than the Panama Canal's 15.2 m limit, so the laden leg takes a longer route: avoiding the Panama Canal.
Emissions and EU ETS
The round voyage burns about 1,975 tonnes of VLSFO, emitting about 6,222 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 130,000 t
- Laden speed
- 12.5 kn at 40 t/day
- Ballast speed
- 13 kn at 33 t/day
- Port time
- 4 days at 25 t/day
- Laden draft
- 17 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a Suezmax take from Angra dos Reis to Long Beach?
About 27 days 8 hours laden at 12.5 knots over 8,201 nm via the Strait of Magellan. The full round voyage, with the ballast leg back and 4 days in port, takes about 55.0 days.
How much fuel does a Suezmax burn on this voyage?
About 1,975 tonnes of VLSFO for the round voyage (1,094 t laden, 781 t ballast, 100 t in port), emitting about 6,222 tonnes of CO2.