Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Basrah Oil Terminal to Kochi

A VLCC carrying 270,000 tonnes from Basrah Oil Terminal to Kochi sails about 1,975 nm laden via the Strait of Hormuz, about 6.6 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 16.9 days and burns about 787 tonnes of fuel.

Round voyage

16.9 d

6.6 d laden

Laden distance

1,975 nm

Shortest route

Fuel (VLSFO)

787 t

Round voyage

CO2

2,480 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Basrah Oil Terminal → Kochi

1,975 nm6.6362 t

Ballast

Kochi → Basrah Oil Terminal

1,975 nm6.3285 t

Port time

Loading and discharge

—4.0140 t
Round voyage3,950 nm16.9787 t

Laden via the Strait of Hormuz; ballast via the Strait of Hormuz.

Emissions and EU ETS

The round voyage burns about 787 tonnes of VLSFO, emitting about 2,480 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Basrah Oil Terminal to Kochi?

About 6 days 14 hours laden at 12.5 knots over 1,975 nm via the Strait of Hormuz. The full round voyage, with the ballast leg back and 4 days in port, takes about 16.9 days.

How much fuel does a VLCC burn on this voyage?

About 787 tonnes of VLSFO for the round voyage (362 t laden, 285 t ballast, 140 t in port), emitting about 2,480 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy