Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

LR1 voyage: Beaumont to Callao

A LR1 carrying 60,000 tonnes from Beaumont to Callao sails about 2,908 nm laden via the Panama Canal, about 9.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 23.0 days and burns about 546 tonnes of fuel.

Round voyage

23.0 d

9.7 d laden

Laden distance

2,908 nm

Shortest route

Fuel (VLSFO)

546 t

Round voyage

CO2

1,720 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Beaumont → Callao

2,908 nm9.7271 t

Ballast

Callao → Beaumont

2,908 nm9.3214 t

Port time

Loading and discharge

—4.060 t
Round voyage5,815 nm23.0546 t

Laden via the Panama Canal; ballast via the Panama Canal.

Emissions and EU ETS

The round voyage burns about 546 tonnes of VLSFO, emitting about 1,720 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
60,000 t
Laden speed
12.5 kn at 28 t/day
Ballast speed
13 kn at 23 t/day
Port time
4 days at 15 t/day
Laden draft
13 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a LR1 take from Beaumont to Callao?

About 9 days 17 hours laden at 12.5 knots over 2,908 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 23.0 days.

How much fuel does a LR1 burn on this voyage?

About 546 tonnes of VLSFO for the round voyage (271 t laden, 214 t ballast, 60 t in port), emitting about 1,720 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy