Voyage estimate
Aframax voyage: Beaumont to Mailiao
A Aframax carrying 80,000 tonnes from Beaumont to Mailiao sails about 10,500 nm laden via the Panama Canal, about 35.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 72.7 days and burns about 2,144 tonnes of fuel.
Round voyage
72.7 d
35.0 d laden
Laden distance
10,500 nm
Shortest route
Fuel (VLSFO)
2,144 t
Round voyage
CO2
6,755 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Beaumont → Mailiao | 10,500 nm | 12.5 kn | 35.0 | 1,155 t |
Ballast Mailiao → Beaumont | 10,500 nm | 13 kn | 33.7 | 909 t |
Port time Loading and discharge | — | — | 4.0 | 80 t |
| Round voyage | 21,000 nm | 72.7 | 2,144 t |
Laden via the Panama Canal; ballast via the Panama Canal.
Emissions and EU ETS
The round voyage burns about 2,144 tonnes of VLSFO, emitting about 6,755 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 80,000 t
- Laden speed
- 12.5 kn at 33 t/day
- Ballast speed
- 13 kn at 27 t/day
- Port time
- 4 days at 20 t/day
- Laden draft
- 14.5 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a Aframax take from Beaumont to Mailiao?
About 35 days laden at 12.5 knots over 10,500 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 72.7 days.
How much fuel does a Aframax burn on this voyage?
About 2,144 tonnes of VLSFO for the round voyage (1,155 t laden, 909 t ballast, 80 t in port), emitting about 6,755 tonnes of CO2.