Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: Beaumont to Yeosu

A Aframax carrying 80,000 tonnes from Beaumont to Yeosu sails about 9,942 nm laden via the Panama Canal, about 33.1 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 69.0 days and burns about 2,034 tonnes of fuel.

Round voyage

69.0 d

33.1 d laden

Laden distance

9,942 nm

Shortest route

Fuel (VLSFO)

2,034 t

Round voyage

CO2

6,409 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Beaumont → Yeosu

9,942 nm33.11,094 t

Ballast

Yeosu → Beaumont

9,942 nm31.9860 t

Port time

Loading and discharge

—4.080 t
Round voyage19,885 nm69.02,034 t

Laden via the Panama Canal; ballast via the Panama Canal.

Emissions and EU ETS

The round voyage burns about 2,034 tonnes of VLSFO, emitting about 6,409 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from Beaumont to Yeosu?

About 33 days 3 hours laden at 12.5 knots over 9,942 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 69.0 days.

How much fuel does a Aframax burn on this voyage?

About 2,034 tonnes of VLSFO for the round voyage (1,094 t laden, 860 t ballast, 80 t in port), emitting about 6,409 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy