Voyage estimate
Aframax voyage: Covenas to Qingdao
A Aframax carrying 80,000 tonnes from Covenas to Qingdao sails about 9,195 nm laden via the Panama Canal, about 30.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 64.1 days and burns about 1,887 tonnes of fuel.
Round voyage
64.1 d
30.7 d laden
Laden distance
9,195 nm
Shortest route
Fuel (VLSFO)
1,887 t
Round voyage
CO2
5,947 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Covenas → Qingdao | 9,195 nm | 12.5 kn | 30.7 | 1,011 t |
Ballast Qingdao → Covenas | 9,195 nm | 13 kn | 29.5 | 796 t |
Port time Loading and discharge | — | — | 4.0 | 80 t |
| Round voyage | 18,391 nm | 64.1 | 1,887 t |
Laden via the Panama Canal; ballast via the Panama Canal.
Emissions and EU ETS
The round voyage burns about 1,887 tonnes of VLSFO, emitting about 5,947 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 80,000 t
- Laden speed
- 12.5 kn at 33 t/day
- Ballast speed
- 13 kn at 27 t/day
- Port time
- 4 days at 20 t/day
- Laden draft
- 14.5 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a Aframax take from Covenas to Qingdao?
About 30 days 16 hours laden at 12.5 knots over 9,195 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 64.1 days.
How much fuel does a Aframax burn on this voyage?
About 1,887 tonnes of VLSFO for the round voyage (1,011 t laden, 796 t ballast, 80 t in port), emitting about 5,947 tonnes of CO2.