Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: Covenas to Rizhao

A Aframax carrying 80,000 tonnes from Covenas to Rizhao sails about 9,188 nm laden via the Panama Canal, about 30.6 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 64.1 days and burns about 1,886 tonnes of fuel.

Round voyage

64.1 d

30.6 d laden

Laden distance

9,188 nm

Shortest route

Fuel (VLSFO)

1,886 t

Round voyage

CO2

5,942 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Covenas → Rizhao

9,188 nm30.61,011 t

Ballast

Rizhao → Covenas

9,188 nm29.4795 t

Port time

Loading and discharge

—4.080 t
Round voyage18,376 nm64.11,886 t

Laden via the Panama Canal; ballast via the Panama Canal.

Emissions and EU ETS

The round voyage burns about 1,886 tonnes of VLSFO, emitting about 5,942 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from Covenas to Rizhao?

About 30 days 15 hours laden at 12.5 knots over 9,188 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 64.1 days.

How much fuel does a Aframax burn on this voyage?

About 1,886 tonnes of VLSFO for the round voyage (1,011 t laden, 795 t ballast, 80 t in port), emitting about 5,942 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy