Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: Covenas to Singapore

A Aframax carrying 80,000 tonnes from Covenas to Singapore sails about 10,970 nm laden via the Panama Canal and Malacca Strait, about 36.6 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 75.7 days and burns about 2,236 tonnes of fuel.

Round voyage

75.7 d

36.6 d laden

Laden distance

10,970 nm

Shortest route

Fuel (VLSFO)

2,236 t

Round voyage

CO2

7,046 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Covenas → Singapore

10,970 nm36.61,207 t

Ballast

Singapore → Covenas

10,970 nm35.2949 t

Port time

Loading and discharge

—4.080 t
Round voyage21,940 nm75.72,236 t

Laden via the Panama Canal and Malacca Strait; ballast via the Panama Canal and Malacca Strait.

Emissions and EU ETS

The round voyage burns about 2,236 tonnes of VLSFO, emitting about 7,046 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from Covenas to Singapore?

About 36 days 14 hours laden at 12.5 knots over 10,970 nm via the Panama Canal and Malacca Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 75.7 days.

How much fuel does a Aframax burn on this voyage?

About 2,236 tonnes of VLSFO for the round voyage (1,207 t laden, 949 t ballast, 80 t in port), emitting about 7,046 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy