Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: CPC Terminal to Vadinar

A Aframax carrying 80,000 tonnes from CPC Terminal to Vadinar sails about 4,207 nm laden via the Bosphorus, Suez Canal and Bab-el-Mandeb, about 14.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 31.5 days and burns about 907 tonnes of fuel.

Round voyage

31.5 d

14.0 d laden

Laden distance

4,207 nm

Shortest route

Fuel (VLSFO)

907 t

Round voyage

CO2

2,858 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

CPC Terminal → Vadinar

4,207 nm14.0463 t

Ballast

Vadinar → CPC Terminal

4,207 nm13.5364 t

Port time

Loading and discharge

—4.080 t
Round voyage8,414 nm31.5907 t

Laden via the Bosphorus, Suez Canal and Bab-el-Mandeb; ballast via the Bosphorus, Suez Canal and Bab-el-Mandeb.

Emissions and EU ETS

The round voyage burns about 907 tonnes of VLSFO, emitting about 2,858 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from CPC Terminal to Vadinar?

About 14 days 1 hour laden at 12.5 knots over 4,207 nm via the Bosphorus, Suez Canal and Bab-el-Mandeb. The full round voyage, with the ballast leg back and 4 days in port, takes about 31.5 days.

How much fuel does a Aframax burn on this voyage?

About 907 tonnes of VLSFO for the round voyage (463 t laden, 364 t ballast, 80 t in port), emitting about 2,858 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy