Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Suezmax voyage: Das Island to Kochi

A Suezmax carrying 130,000 tonnes from Das Island to Kochi sails about 1,756 nm laden via the Strait of Hormuz, about 5.9 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 15.5 days and burns about 520 tonnes of fuel.

Round voyage

15.5 d

5.9 d laden

Laden distance

1,756 nm

Shortest route

Fuel (VLSFO)

520 t

Round voyage

CO2

1,638 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Das Island → Kochi

1,756 nm5.9234 t

Ballast

Kochi → Das Island

1,756 nm5.6186 t

Port time

Loading and discharge

—4.0100 t
Round voyage3,512 nm15.5520 t

Laden via the Strait of Hormuz; ballast via the Strait of Hormuz.

Emissions and EU ETS

The round voyage burns about 520 tonnes of VLSFO, emitting about 1,638 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
130,000 t
Laden speed
12.5 kn at 40 t/day
Ballast speed
13 kn at 33 t/day
Port time
4 days at 25 t/day
Laden draft
17 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Suezmax take from Das Island to Kochi?

About 5 days 20 hours laden at 12.5 knots over 1,756 nm via the Strait of Hormuz. The full round voyage, with the ballast leg back and 4 days in port, takes about 15.5 days.

How much fuel does a Suezmax burn on this voyage?

About 520 tonnes of VLSFO for the round voyage (234 t laden, 186 t ballast, 100 t in port), emitting about 1,638 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy