Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Das Island to Vadinar

A VLCC carrying 270,000 tonnes from Das Island to Vadinar sails about 1,078 nm laden via the Strait of Hormuz, about 3.6 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 11.1 days and burns about 493 tonnes of fuel.

Round voyage

11.1 d

3.6 d laden

Laden distance

1,078 nm

Shortest route

Fuel (VLSFO)

493 t

Round voyage

CO2

1,554 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Das Island → Vadinar

1,078 nm3.6198 t

Ballast

Vadinar → Das Island

1,078 nm3.5156 t

Port time

Loading and discharge

—4.0140 t
Round voyage2,157 nm11.1493 t

Laden via the Strait of Hormuz; ballast via the Strait of Hormuz.

Emissions and EU ETS

The round voyage burns about 493 tonnes of VLSFO, emitting about 1,554 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Das Island to Vadinar?

About 3 days 14 hours laden at 12.5 knots over 1,078 nm via the Strait of Hormuz. The full round voyage, with the ballast leg back and 4 days in port, takes about 11.1 days.

How much fuel does a VLCC burn on this voyage?

About 493 tonnes of VLSFO for the round voyage (198 t laden, 156 t ballast, 140 t in port), emitting about 1,554 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy