Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Esmeraldas to Long Beach

A VLCC carrying 270,000 tonnes from Esmeraldas to Long Beach sails about 3,011 nm laden on the open-sea route, about 10.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 23.7 days and burns about 1,126 tonnes of fuel.

Round voyage

23.7 d

10.0 d laden

Laden distance

3,011 nm

Shortest route

Fuel (VLSFO)

1,126 t

Round voyage

CO2

3,549 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Esmeraldas → Long Beach

3,011 nm10.0552 t

Ballast

Long Beach → Esmeraldas

3,011 nm9.7434 t

Port time

Loading and discharge

—4.0140 t
Round voyage6,023 nm23.71,126 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 1,126 tonnes of VLSFO, emitting about 3,549 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Esmeraldas to Long Beach?

About 10 days 1 hour laden at 12.5 knots over 3,011 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 23.7 days.

How much fuel does a VLCC burn on this voyage?

About 1,126 tonnes of VLSFO for the round voyage (552 t laden, 434 t ballast, 140 t in port), emitting about 3,549 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy