Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Freeport to Vadinar

A VLCC carrying 270,000 tonnes from Freeport to Vadinar sails about 12,215 nm laden via the Cape of Good Hope, about 40.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 75.7 days and burns about 3,774 tonnes of fuel.

Round voyage

75.7 d

40.7 d laden

Laden distance

12,215 nm

Via the Cape of Good Hope (avoiding Suez and the Red Sea)

Fuel (VLSFO)

3,774 t

Round voyage

CO2

11,893 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Freeport → Vadinar

12,215 nm40.72,239 t

Ballast

Vadinar → Freeport

9,671 nm31.01,395 t

Port time

Loading and discharge

—4.0140 t
Round voyage21,886 nm75.73,774 t

Laden via the Cape of Good Hope; ballast via the Strait of Gibraltar, Suez Canal and Bab-el-Mandeb.

A laden VLCC draws about 22.5 m, deeper than the Suez Canal's 20.1 m limit, so the laden leg takes a longer route: via the Cape of Good Hope (avoiding Suez and the Red Sea).

Emissions and EU ETS

The round voyage burns about 3,774 tonnes of VLSFO, emitting about 11,893 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Freeport to Vadinar?

About 40 days 17 hours laden at 12.5 knots over 12,215 nm via the Cape of Good Hope. The full round voyage, with the ballast leg back and 4 days in port, takes about 75.7 days.

How much fuel does a VLCC burn on this voyage?

About 3,774 tonnes of VLSFO for the round voyage (2,239 t laden, 1,395 t ballast, 140 t in port), emitting about 11,893 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy