Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Fujairah to Mailiao

A VLCC carrying 270,000 tonnes from Fujairah to Mailiao sails about 5,110 nm laden via the Malacca Strait, about 17.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 37.4 days and burns about 1,814 tonnes of fuel.

Round voyage

37.4 d

17.0 d laden

Laden distance

5,110 nm

Shortest route

Fuel (VLSFO)

1,814 t

Round voyage

CO2

5,715 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Fujairah → Mailiao

5,110 nm17.0937 t

Ballast

Mailiao → Fujairah

5,110 nm16.4737 t

Port time

Loading and discharge

—4.0140 t
Round voyage10,219 nm37.41,814 t

Laden via the Malacca Strait; ballast via the Malacca Strait.

Emissions and EU ETS

The round voyage burns about 1,814 tonnes of VLSFO, emitting about 5,715 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Fujairah to Mailiao?

About 17 days 1 hour laden at 12.5 knots over 5,110 nm via the Malacca Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 37.4 days.

How much fuel does a VLCC burn on this voyage?

About 1,814 tonnes of VLSFO for the round voyage (937 t laden, 737 t ballast, 140 t in port), emitting about 5,715 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy