Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

LR1 voyage: Garyville to Balboa

A LR1 carrying 60,000 tonnes from Garyville to Balboa sails about 1,429 nm laden via the Panama Canal, about 4.8 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 13.3 days and burns about 299 tonnes of fuel.

Round voyage

13.3 d

4.8 d laden

Laden distance

1,429 nm

Shortest route

Fuel (VLSFO)

299 t

Round voyage

CO2

941 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Garyville → Balboa

1,429 nm4.8133 t

Ballast

Balboa → Garyville

1,429 nm4.6105 t

Port time

Loading and discharge

—4.060 t
Round voyage2,858 nm13.3299 t

Laden via the Panama Canal; ballast via the Panama Canal.

Emissions and EU ETS

The round voyage burns about 299 tonnes of VLSFO, emitting about 941 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
60,000 t
Laden speed
12.5 kn at 28 t/day
Ballast speed
13 kn at 23 t/day
Port time
4 days at 15 t/day
Laden draft
13 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a LR1 take from Garyville to Balboa?

About 4 days 18 hours laden at 12.5 knots over 1,429 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 13.3 days.

How much fuel does a LR1 burn on this voyage?

About 299 tonnes of VLSFO for the round voyage (133 t laden, 105 t ballast, 60 t in port), emitting about 941 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy