Voyage estimate
LR1 voyage: Garyville to Callao
A LR1 carrying 60,000 tonnes from Garyville to Callao sails about 2,829 nm laden via the Panama Canal, about 9.4 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 22.5 days and burns about 533 tonnes of fuel.
Round voyage
22.5 d
9.4 d laden
Laden distance
2,829 nm
Shortest route
Fuel (VLSFO)
533 t
Round voyage
CO2
1,678 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Garyville → Callao | 2,829 nm | 12.5 kn | 9.4 | 264 t |
Ballast Callao → Garyville | 2,829 nm | 13 kn | 9.1 | 209 t |
Port time Loading and discharge | — | — | 4.0 | 60 t |
| Round voyage | 5,658 nm | 22.5 | 533 t |
Laden via the Panama Canal; ballast via the Panama Canal.
Emissions and EU ETS
The round voyage burns about 533 tonnes of VLSFO, emitting about 1,678 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 60,000 t
- Laden speed
- 12.5 kn at 28 t/day
- Ballast speed
- 13 kn at 23 t/day
- Port time
- 4 days at 15 t/day
- Laden draft
- 13 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a LR1 take from Garyville to Callao?
About 9 days 10 hours laden at 12.5 knots over 2,829 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 22.5 days.
How much fuel does a LR1 burn on this voyage?
About 533 tonnes of VLSFO for the round voyage (264 t laden, 209 t ballast, 60 t in port), emitting about 1,678 tonnes of CO2.