Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

LR1 voyage: Garyville to Montevideo

A LR1 carrying 60,000 tonnes from Garyville to Montevideo sails about 6,215 nm laden on the open-sea route, about 20.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 44.6 days and burns about 1,098 tonnes of fuel.

Round voyage

44.6 d

20.7 d laden

Laden distance

6,215 nm

Shortest route

Fuel (VLSFO)

1,098 t

Round voyage

CO2

3,461 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Garyville → Montevideo

6,215 nm20.7580 t

Ballast

Montevideo → Garyville

6,215 nm19.9458 t

Port time

Loading and discharge

—4.060 t
Round voyage12,430 nm44.61,098 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 1,098 tonnes of VLSFO, emitting about 3,461 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
60,000 t
Laden speed
12.5 kn at 28 t/day
Ballast speed
13 kn at 23 t/day
Port time
4 days at 15 t/day
Laden draft
13 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a LR1 take from Garyville to Montevideo?

About 20 days 17 hours laden at 12.5 knots over 6,215 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 44.6 days.

How much fuel does a LR1 burn on this voyage?

About 1,098 tonnes of VLSFO for the round voyage (580 t laden, 458 t ballast, 60 t in port), emitting about 3,461 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy