Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Houston to Ulsan

A VLCC carrying 270,000 tonnes from Houston to Ulsan sails about 15,538 nm laden via the Cape of Good Hope and Sunda Strait, about 51.8 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 87.5 days and burns about 4,413 tonnes of fuel.

Round voyage

87.5 d

51.8 d laden

Laden distance

15,538 nm

Via the Cape (avoiding both Suez and Panama)

Fuel (VLSFO)

4,413 t

Round voyage

CO2

13,907 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Houston → Ulsan

15,538 nm51.82,849 t

Ballast

Ulsan → Houston

9,879 nm31.71,425 t

Port time

Loading and discharge

—4.0140 t
Round voyage25,417 nm87.54,413 t

Laden via the Cape of Good Hope and Sunda Strait; ballast via the Panama Canal.

A laden VLCC draws about 22.5 m, deeper than the Panama Canal's 15.2 m limit, so the laden leg takes a longer route: via the Cape (avoiding both Suez and Panama).

Emissions and EU ETS

The round voyage burns about 4,413 tonnes of VLSFO, emitting about 13,907 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Houston to Ulsan?

About 51 days 19 hours laden at 12.5 knots over 15,538 nm via the Cape of Good Hope and Sunda Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 87.5 days.

How much fuel does a VLCC burn on this voyage?

About 4,413 tonnes of VLSFO for the round voyage (2,849 t laden, 1,425 t ballast, 140 t in port), emitting about 13,907 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy