Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

LR1 voyage: Jamnagar to Port Louis

A LR1 carrying 60,000 tonnes from Jamnagar to Port Louis sails about 2,739 nm laden on the open-sea route, about 9.1 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 21.9 days and burns about 517 tonnes of fuel.

Round voyage

21.9 d

9.1 d laden

Laden distance

2,739 nm

Shortest route

Fuel (VLSFO)

517 t

Round voyage

CO2

1,631 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Jamnagar → Port Louis

2,739 nm9.1256 t

Ballast

Port Louis → Jamnagar

2,739 nm8.8202 t

Port time

Loading and discharge

—4.060 t
Round voyage5,477 nm21.9517 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 517 tonnes of VLSFO, emitting about 1,631 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
60,000 t
Laden speed
12.5 kn at 28 t/day
Ballast speed
13 kn at 23 t/day
Port time
4 days at 15 t/day
Laden draft
13 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a LR1 take from Jamnagar to Port Louis?

About 9 days 3 hours laden at 12.5 knots over 2,739 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 21.9 days.

How much fuel does a LR1 burn on this voyage?

About 517 tonnes of VLSFO for the round voyage (256 t laden, 202 t ballast, 60 t in port), emitting about 1,631 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy