Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

MR voyage: Jamnagar to Singapore

A MR carrying 37,000 tonnes from Jamnagar to Singapore sails about 2,741 nm laden via the Malacca Strait, about 9.1 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 21.9 days and burns about 435 tonnes of fuel.

Round voyage

21.9 d

9.1 d laden

Laden distance

2,741 nm

Shortest route

Fuel (VLSFO)

435 t

Round voyage

CO2

1,371 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Jamnagar → Singapore

2,741 nm9.1219 t

Ballast

Singapore → Jamnagar

2,741 nm8.8176 t

Port time

Loading and discharge

—4.040 t
Round voyage5,483 nm21.9435 t

Laden via the Malacca Strait; ballast via the Malacca Strait.

Emissions and EU ETS

The round voyage burns about 435 tonnes of VLSFO, emitting about 1,371 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
37,000 t
Laden speed
12.5 kn at 24 t/day
Ballast speed
13 kn at 20 t/day
Port time
4 days at 10 t/day
Laden draft
12 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a MR take from Jamnagar to Singapore?

About 9 days 3 hours laden at 12.5 knots over 2,741 nm via the Malacca Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 21.9 days.

How much fuel does a MR burn on this voyage?

About 435 tonnes of VLSFO for the round voyage (219 t laden, 176 t ballast, 40 t in port), emitting about 1,371 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy