Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Suezmax voyage: Jebel Dhanna to Dalian

A Suezmax carrying 130,000 tonnes from Jebel Dhanna to Dalian sails about 6,336 nm laden via the Strait of Hormuz and Malacca Strait, about 21.1 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 45.4 days and burns about 1,615 tonnes of fuel.

Round voyage

45.4 d

21.1 d laden

Laden distance

6,336 nm

Shortest route

Fuel (VLSFO)

1,615 t

Round voyage

CO2

5,089 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Jebel Dhanna → Dalian

6,336 nm21.1845 t

Ballast

Dalian → Jebel Dhanna

6,336 nm20.3670 t

Port time

Loading and discharge

—4.0100 t
Round voyage12,672 nm45.41,615 t

Laden via the Strait of Hormuz and Malacca Strait; ballast via the Strait of Hormuz and Malacca Strait.

Emissions and EU ETS

The round voyage burns about 1,615 tonnes of VLSFO, emitting about 5,089 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
130,000 t
Laden speed
12.5 kn at 40 t/day
Ballast speed
13 kn at 33 t/day
Port time
4 days at 25 t/day
Laden draft
17 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Suezmax take from Jebel Dhanna to Dalian?

About 21 days 3 hours laden at 12.5 knots over 6,336 nm via the Strait of Hormuz and Malacca Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 45.4 days.

How much fuel does a Suezmax burn on this voyage?

About 1,615 tonnes of VLSFO for the round voyage (845 t laden, 670 t ballast, 100 t in port), emitting about 5,089 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy