Voyage estimate
Suezmax voyage: Jose to Long Beach
A Suezmax carrying 130,000 tonnes from Jose to Long Beach sails about 11,410 nm laden via the Strait of Magellan, about 38.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 54.9 days and burns about 2,047 tonnes of fuel.
Round voyage
54.9 d
38.0 d laden
Laden distance
11,410 nm
Avoiding the Panama Canal
Fuel (VLSFO)
2,047 t
Round voyage
CO2
6,449 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Jose → Long Beach | 11,410 nm | 12.5 kn | 38.0 | 1,521 t |
Ballast Long Beach → Jose | 4,021 nm | 13 kn | 12.9 | 425 t |
Port time Loading and discharge | — | — | 4.0 | 100 t |
| Round voyage | 15,431 nm | 54.9 | 2,047 t |
Laden via the Strait of Magellan; ballast via the Panama Canal.
A laden Suezmax draws about 17 m, deeper than the Panama Canal's 15.2 m limit, so the laden leg takes a longer route: avoiding the Panama Canal.
Emissions and EU ETS
The round voyage burns about 2,047 tonnes of VLSFO, emitting about 6,449 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 130,000 t
- Laden speed
- 12.5 kn at 40 t/day
- Ballast speed
- 13 kn at 33 t/day
- Port time
- 4 days at 25 t/day
- Laden draft
- 17 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a Suezmax take from Jose to Long Beach?
About 38 days 1 hour laden at 12.5 knots over 11,410 nm via the Strait of Magellan. The full round voyage, with the ballast leg back and 4 days in port, takes about 54.9 days.
How much fuel does a Suezmax burn on this voyage?
About 2,047 tonnes of VLSFO for the round voyage (1,521 t laden, 425 t ballast, 100 t in port), emitting about 6,449 tonnes of CO2.