Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

MR voyage: Lake Charles to Balboa

A MR carrying 37,000 tonnes from Lake Charles to Balboa sails about 1,499 nm laden via the Panama Canal, about 5.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 13.8 days and burns about 256 tonnes of fuel.

Round voyage

13.8 d

5.0 d laden

Laden distance

1,499 nm

Shortest route

Fuel (VLSFO)

256 t

Round voyage

CO2

807 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Lake Charles → Balboa

1,499 nm5.0120 t

Ballast

Balboa → Lake Charles

1,499 nm4.896 t

Port time

Loading and discharge

—4.040 t
Round voyage2,998 nm13.8256 t

Laden via the Panama Canal; ballast via the Panama Canal.

Emissions and EU ETS

The round voyage burns about 256 tonnes of VLSFO, emitting about 807 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
37,000 t
Laden speed
12.5 kn at 24 t/day
Ballast speed
13 kn at 20 t/day
Port time
4 days at 10 t/day
Laden draft
12 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a MR take from Lake Charles to Balboa?

About 5 days laden at 12.5 knots over 1,499 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 13.8 days.

How much fuel does a MR burn on this voyage?

About 256 tonnes of VLSFO for the round voyage (120 t laden, 96 t ballast, 40 t in port), emitting about 807 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy