Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

MR voyage: Lake Charles to Itaqui

A MR carrying 37,000 tonnes from Lake Charles to Itaqui sails about 3,520 nm laden on the open-sea route, about 11.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 27.0 days and burns about 547 tonnes of fuel.

Round voyage

27.0 d

11.7 d laden

Laden distance

3,520 nm

Shortest route

Fuel (VLSFO)

547 t

Round voyage

CO2

1,724 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Lake Charles → Itaqui

3,520 nm11.7282 t

Ballast

Itaqui → Lake Charles

3,520 nm11.3226 t

Port time

Loading and discharge

—4.040 t
Round voyage7,040 nm27.0547 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 547 tonnes of VLSFO, emitting about 1,724 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
37,000 t
Laden speed
12.5 kn at 24 t/day
Ballast speed
13 kn at 20 t/day
Port time
4 days at 10 t/day
Laden draft
12 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a MR take from Lake Charles to Itaqui?

About 11 days 18 hours laden at 12.5 knots over 3,520 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 27.0 days.

How much fuel does a MR burn on this voyage?

About 547 tonnes of VLSFO for the round voyage (282 t laden, 226 t ballast, 40 t in port), emitting about 1,724 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy