Voyage estimate
LR1 voyage: Lake Charles to Puerto Cortes
A LR1 carrying 60,000 tonnes from Lake Charles to Puerto Cortes sails about 988 nm laden on the open-sea route, about 3.3 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 10.5 days and burns about 225 tonnes of fuel.
Round voyage
10.5 d
3.3 d laden
Laden distance
988 nm
Shortest route
Fuel (VLSFO)
225 t
Round voyage
CO2
709 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Lake Charles → Puerto Cortes | 988 nm | 12.5 kn | 3.3 | 92 t |
Ballast Puerto Cortes → Lake Charles | 988 nm | 13 kn | 3.2 | 73 t |
Port time Loading and discharge | — | — | 4.0 | 60 t |
| Round voyage | 1,976 nm | 10.5 | 225 t |
Laden on the open-sea route; ballast on the open-sea route.
Emissions and EU ETS
The round voyage burns about 225 tonnes of VLSFO, emitting about 709 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 60,000 t
- Laden speed
- 12.5 kn at 28 t/day
- Ballast speed
- 13 kn at 23 t/day
- Port time
- 4 days at 15 t/day
- Laden draft
- 13 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a LR1 take from Lake Charles to Puerto Cortes?
About 3 days 7 hours laden at 12.5 knots over 988 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 10.5 days.
How much fuel does a LR1 burn on this voyage?
About 225 tonnes of VLSFO for the round voyage (92 t laden, 73 t ballast, 60 t in port), emitting about 709 tonnes of CO2.