Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Suezmax voyage: LOOP to Vadinar

A Suezmax carrying 130,000 tonnes from LOOP to Vadinar sails about 9,420 nm laden via the Strait of Gibraltar, Suez Canal and Bab-el-Mandeb, about 31.4 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 65.6 days and burns about 2,352 tonnes of fuel.

Round voyage

65.6 d

31.4 d laden

Laden distance

9,420 nm

Shortest route

Fuel (VLSFO)

2,352 t

Round voyage

CO2

7,413 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

LOOP → Vadinar

9,420 nm31.41,256 t

Ballast

Vadinar → LOOP

9,420 nm30.2996 t

Port time

Loading and discharge

—4.0100 t
Round voyage18,841 nm65.62,352 t

Laden via the Strait of Gibraltar, Suez Canal and Bab-el-Mandeb; ballast via the Strait of Gibraltar, Suez Canal and Bab-el-Mandeb.

Emissions and EU ETS

The round voyage burns about 2,352 tonnes of VLSFO, emitting about 7,413 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
130,000 t
Laden speed
12.5 kn at 40 t/day
Ballast speed
13 kn at 33 t/day
Port time
4 days at 25 t/day
Laden draft
17 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Suezmax take from LOOP to Vadinar?

About 31 days 10 hours laden at 12.5 knots over 9,420 nm via the Strait of Gibraltar, Suez Canal and Bab-el-Mandeb. The full round voyage, with the ballast leg back and 4 days in port, takes about 65.6 days.

How much fuel does a Suezmax burn on this voyage?

About 2,352 tonnes of VLSFO for the round voyage (1,256 t laden, 996 t ballast, 100 t in port), emitting about 7,413 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy