Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

MR voyage: Mailiao to Melbourne

A MR carrying 37,000 tonnes from Mailiao to Melbourne sails about 5,011 nm laden on the open-sea route, about 16.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 36.8 days and burns about 762 tonnes of fuel.

Round voyage

36.8 d

16.7 d laden

Laden distance

5,011 nm

Shortest route

Fuel (VLSFO)

762 t

Round voyage

CO2

2,401 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Mailiao → Melbourne

5,011 nm16.7401 t

Ballast

Melbourne → Mailiao

5,011 nm16.1321 t

Port time

Loading and discharge

—4.040 t
Round voyage10,021 nm36.8762 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 762 tonnes of VLSFO, emitting about 2,401 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
37,000 t
Laden speed
12.5 kn at 24 t/day
Ballast speed
13 kn at 20 t/day
Port time
4 days at 10 t/day
Laden draft
12 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a MR take from Mailiao to Melbourne?

About 16 days 17 hours laden at 12.5 knots over 5,011 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 36.8 days.

How much fuel does a MR burn on this voyage?

About 762 tonnes of VLSFO for the round voyage (401 t laden, 321 t ballast, 40 t in port), emitting about 2,401 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy