Voyage estimate
MR voyage: Mailiao to Tanjung Priok
A MR carrying 37,000 tonnes from Mailiao to Tanjung Priok sails about 2,107 nm laden on the open-sea route, about 7.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 17.8 days and burns about 344 tonnes of fuel.
Round voyage
17.8 d
7.0 d laden
Laden distance
2,107 nm
Shortest route
Fuel (VLSFO)
344 t
Round voyage
CO2
1,083 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Mailiao → Tanjung Priok | 2,107 nm | 12.5 kn | 7.0 | 169 t |
Ballast Tanjung Priok → Mailiao | 2,107 nm | 13 kn | 6.8 | 135 t |
Port time Loading and discharge | — | — | 4.0 | 40 t |
| Round voyage | 4,215 nm | 17.8 | 344 t |
Laden on the open-sea route; ballast on the open-sea route.
Emissions and EU ETS
The round voyage burns about 344 tonnes of VLSFO, emitting about 1,083 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 37,000 t
- Laden speed
- 12.5 kn at 24 t/day
- Ballast speed
- 13 kn at 20 t/day
- Port time
- 4 days at 10 t/day
- Laden draft
- 12 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a MR take from Mailiao to Tanjung Priok?
About 7 days 1 hour laden at 12.5 knots over 2,107 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 17.8 days.
How much fuel does a MR burn on this voyage?
About 344 tonnes of VLSFO for the round voyage (169 t laden, 135 t ballast, 40 t in port), emitting about 1,083 tonnes of CO2.