Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

MR voyage: Mina Abdullah to Colombo

A MR carrying 37,000 tonnes from Mina Abdullah to Colombo sails about 2,312 nm laden via the Strait of Hormuz, about 7.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 19.1 days and burns about 373 tonnes of fuel.

Round voyage

19.1 d

7.7 d laden

Laden distance

2,312 nm

Shortest route

Fuel (VLSFO)

373 t

Round voyage

CO2

1,176 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Mina Abdullah → Colombo

2,312 nm7.7185 t

Ballast

Colombo → Mina Abdullah

2,312 nm7.4148 t

Port time

Loading and discharge

—4.040 t
Round voyage4,624 nm19.1373 t

Laden via the Strait of Hormuz; ballast via the Strait of Hormuz.

Emissions and EU ETS

The round voyage burns about 373 tonnes of VLSFO, emitting about 1,176 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
37,000 t
Laden speed
12.5 kn at 24 t/day
Ballast speed
13 kn at 20 t/day
Port time
4 days at 10 t/day
Laden draft
12 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a MR take from Mina Abdullah to Colombo?

About 7 days 17 hours laden at 12.5 knots over 2,312 nm via the Strait of Hormuz. The full round voyage, with the ballast leg back and 4 days in port, takes about 19.1 days.

How much fuel does a MR burn on this voyage?

About 373 tonnes of VLSFO for the round voyage (185 t laden, 148 t ballast, 40 t in port), emitting about 1,176 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy