Voyage estimate
VLCC voyage: Mina Al Ahmadi to Houston
A VLCC carrying 270,000 tonnes from Mina Al Ahmadi to Houston sails about 12,730 nm laden via the Cape of Good Hope and Strait of Hormuz, about 42.4 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 78.5 days and burns about 3,918 tonnes of fuel.
Round voyage
78.5 d
42.4 d laden
Laden distance
12,730 nm
Via the Cape of Good Hope (avoiding Suez and the Red Sea)
Fuel (VLSFO)
3,918 t
Round voyage
CO2
12,347 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Mina Al Ahmadi → Houston | 12,730 nm | 12.5 kn | 42.4 | 2,334 t |
Ballast Houston → Mina Al Ahmadi | 10,016 nm | 13 kn | 32.1 | 1,445 t |
Port time Loading and discharge | — | — | 4.0 | 140 t |
| Round voyage | 22,745 nm | 78.5 | 3,918 t |
Laden via the Cape of Good Hope and Strait of Hormuz; ballast via the Strait of Hormuz, Bab-el-Mandeb, Suez Canal and Strait of Gibraltar.
A laden VLCC draws about 22.5 m, deeper than the Suez Canal's 20.1 m limit, so the laden leg takes a longer route: via the Cape of Good Hope (avoiding Suez and the Red Sea).
Emissions and EU ETS
The round voyage burns about 3,918 tonnes of VLSFO, emitting about 12,347 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 270,000 t
- Laden speed
- 12.5 kn at 55 t/day
- Ballast speed
- 13 kn at 45 t/day
- Port time
- 4 days at 35 t/day
- Laden draft
- 22.5 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a VLCC take from Mina Al Ahmadi to Houston?
About 42 days 10 hours laden at 12.5 knots over 12,730 nm via the Cape of Good Hope and Strait of Hormuz. The full round voyage, with the ballast leg back and 4 days in port, takes about 78.5 days.
How much fuel does a VLCC burn on this voyage?
About 3,918 tonnes of VLSFO for the round voyage (2,334 t laden, 1,445 t ballast, 140 t in port), emitting about 12,347 tonnes of CO2.