Voyage estimate
Suezmax voyage: Mina Al Ahmadi to Mailiao
A Suezmax carrying 130,000 tonnes from Mina Al Ahmadi to Mailiao sails about 5,682 nm laden via the Strait of Hormuz and Malacca Strait, about 18.9 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 41.1 days and burns about 1,458 tonnes of fuel.
Round voyage
41.1 d
18.9 d laden
Laden distance
5,682 nm
Shortest route
Fuel (VLSFO)
1,458 t
Round voyage
CO2
4,596 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Mina Al Ahmadi → Mailiao | 5,682 nm | 12.5 kn | 18.9 | 758 t |
Ballast Mailiao → Mina Al Ahmadi | 5,682 nm | 13 kn | 18.2 | 601 t |
Port time Loading and discharge | — | — | 4.0 | 100 t |
| Round voyage | 11,363 nm | 41.1 | 1,458 t |
Laden via the Strait of Hormuz and Malacca Strait; ballast via the Strait of Hormuz and Malacca Strait.
Emissions and EU ETS
The round voyage burns about 1,458 tonnes of VLSFO, emitting about 4,596 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 130,000 t
- Laden speed
- 12.5 kn at 40 t/day
- Ballast speed
- 13 kn at 33 t/day
- Port time
- 4 days at 25 t/day
- Laden draft
- 17 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a Suezmax take from Mina Al Ahmadi to Mailiao?
About 18 days 23 hours laden at 12.5 knots over 5,682 nm via the Strait of Hormuz and Malacca Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 41.1 days.
How much fuel does a Suezmax burn on this voyage?
About 1,458 tonnes of VLSFO for the round voyage (758 t laden, 601 t ballast, 100 t in port), emitting about 4,596 tonnes of CO2.