Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Mina Al Fahal to Chittagong

A VLCC carrying 270,000 tonnes from Mina Al Fahal to Chittagong sails about 2,811 nm laden on the open-sea route, about 9.4 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 22.4 days and burns about 1,061 tonnes of fuel.

Round voyage

22.4 d

9.4 d laden

Laden distance

2,811 nm

Shortest route

Fuel (VLSFO)

1,061 t

Round voyage

CO2

3,343 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Mina Al Fahal → Chittagong

2,811 nm9.4515 t

Ballast

Chittagong → Mina Al Fahal

2,811 nm9.0405 t

Port time

Loading and discharge

—4.0140 t
Round voyage5,622 nm22.41,061 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 1,061 tonnes of VLSFO, emitting about 3,343 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Mina Al Fahal to Chittagong?

About 9 days 9 hours laden at 12.5 knots over 2,811 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 22.4 days.

How much fuel does a VLCC burn on this voyage?

About 1,061 tonnes of VLSFO for the round voyage (515 t laden, 405 t ballast, 140 t in port), emitting about 3,343 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy