Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

MR voyage: Pascagoula to Tuxpan

A MR carrying 37,000 tonnes from Pascagoula to Tuxpan sails about 776 nm laden on the open-sea route, about 2.6 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 9.1 days and burns about 152 tonnes of fuel.

Round voyage

9.1 d

2.6 d laden

Laden distance

776 nm

Shortest route

Fuel (VLSFO)

152 t

Round voyage

CO2

479 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Pascagoula → Tuxpan

776 nm2.662 t

Ballast

Tuxpan → Pascagoula

776 nm2.550 t

Port time

Loading and discharge

—4.040 t
Round voyage1,553 nm9.1152 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 152 tonnes of VLSFO, emitting about 479 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
37,000 t
Laden speed
12.5 kn at 24 t/day
Ballast speed
13 kn at 20 t/day
Port time
4 days at 10 t/day
Laden draft
12 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a MR take from Pascagoula to Tuxpan?

About 2 days 14 hours laden at 12.5 knots over 776 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 9.1 days.

How much fuel does a MR burn on this voyage?

About 152 tonnes of VLSFO for the round voyage (62 t laden, 50 t ballast, 40 t in port), emitting about 479 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy