Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Suezmax voyage: Qua Iboe to Philadelphia

A Suezmax carrying 130,000 tonnes from Qua Iboe to Philadelphia sails about 5,472 nm laden on the open-sea route, about 18.2 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 39.8 days and burns about 1,408 tonnes of fuel.

Round voyage

39.8 d

18.2 d laden

Laden distance

5,472 nm

Shortest route

Fuel (VLSFO)

1,408 t

Round voyage

CO2

4,438 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Qua Iboe → Philadelphia

5,472 nm18.2730 t

Ballast

Philadelphia → Qua Iboe

5,472 nm17.5579 t

Port time

Loading and discharge

—4.0100 t
Round voyage10,944 nm39.81,408 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 1,408 tonnes of VLSFO, emitting about 4,438 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
130,000 t
Laden speed
12.5 kn at 40 t/day
Ballast speed
13 kn at 33 t/day
Port time
4 days at 25 t/day
Laden draft
17 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Suezmax take from Qua Iboe to Philadelphia?

About 18 days 6 hours laden at 12.5 knots over 5,472 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 39.8 days.

How much fuel does a Suezmax burn on this voyage?

About 1,408 tonnes of VLSFO for the round voyage (730 t laden, 579 t ballast, 100 t in port), emitting about 4,438 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy