Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Sao Sebastiao to Long Beach

A VLCC carrying 270,000 tonnes from Sao Sebastiao to Long Beach sails about 8,023 nm laden via the Strait of Magellan, about 26.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 55.0 days and burns about 2,702 tonnes of fuel.

Round voyage

55.0 d

26.7 d laden

Laden distance

8,023 nm

Avoiding the Panama Canal

Fuel (VLSFO)

2,702 t

Round voyage

CO2

8,514 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Sao Sebastiao → Long Beach

8,023 nm26.71,471 t

Ballast

Long Beach → Sao Sebastiao

7,564 nm24.21,091 t

Port time

Loading and discharge

—4.0140 t
Round voyage15,588 nm55.02,702 t

Laden via the Strait of Magellan; ballast via the Panama Canal.

A laden VLCC draws about 22.5 m, deeper than the Panama Canal's 15.2 m limit, so the laden leg takes a longer route: avoiding the Panama Canal.

Emissions and EU ETS

The round voyage burns about 2,702 tonnes of VLSFO, emitting about 8,514 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Sao Sebastiao to Long Beach?

About 26 days 18 hours laden at 12.5 knots over 8,023 nm via the Strait of Magellan. The full round voyage, with the ballast leg back and 4 days in port, takes about 55.0 days.

How much fuel does a VLCC burn on this voyage?

About 2,702 tonnes of VLSFO for the round voyage (1,471 t laden, 1,091 t ballast, 140 t in port), emitting about 8,514 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy