Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Suezmax voyage: Sao Sebastiao to Philadelphia

A Suezmax carrying 130,000 tonnes from Sao Sebastiao to Philadelphia sails about 5,051 nm laden on the open-sea route, about 16.8 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 37.0 days and burns about 1,308 tonnes of fuel.

Round voyage

37.0 d

16.8 d laden

Laden distance

5,051 nm

Shortest route

Fuel (VLSFO)

1,308 t

Round voyage

CO2

4,120 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Sao Sebastiao → Philadelphia

5,051 nm16.8673 t

Ballast

Philadelphia → Sao Sebastiao

5,051 nm16.2534 t

Port time

Loading and discharge

—4.0100 t
Round voyage10,101 nm37.01,308 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 1,308 tonnes of VLSFO, emitting about 4,120 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
130,000 t
Laden speed
12.5 kn at 40 t/day
Ballast speed
13 kn at 33 t/day
Port time
4 days at 25 t/day
Laden draft
17 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Suezmax take from Sao Sebastiao to Philadelphia?

About 16 days 20 hours laden at 12.5 knots over 5,051 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 37.0 days.

How much fuel does a Suezmax burn on this voyage?

About 1,308 tonnes of VLSFO for the round voyage (673 t laden, 534 t ballast, 100 t in port), emitting about 4,120 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy