Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: Sidi Kerir to Cartagena

A Aframax carrying 80,000 tonnes from Sidi Kerir to Cartagena sails about 1,588 nm laden on the open-sea route, about 5.3 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 14.4 days and burns about 392 tonnes of fuel.

Round voyage

14.4 d

5.3 d laden

Laden distance

1,588 nm

Shortest route

Fuel (VLSFO)

392 t

Round voyage

CO2

1,236 t

618 t in EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Sidi Kerir → Cartagena

1,588 nm5.3175 t

Ballast

Cartagena → Sidi Kerir

1,588 nm5.1137 t

Port time

Loading and discharge

—4.080 t
Round voyage3,176 nm14.4392 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 392 tonnes of VLSFO, emitting about 1,236 tonnes of CO2. One end of the voyage is in the EU ETS area, so half of the emissions at sea count, plus emissions at the EU berth: about 618 tonnes of CO2, or the same number of EU allowances.

From 2026 shipping companies surrender allowances for 100% of in-scope emissions. Who pays is for the charter party to say.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from Sidi Kerir to Cartagena?

About 5 days 7 hours laden at 12.5 knots over 1,588 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 14.4 days.

How much fuel does a Aframax burn on this voyage?

About 392 tonnes of VLSFO for the round voyage (175 t laden, 137 t ballast, 80 t in port), emitting about 1,236 tonnes of CO2.

Is this voyage in the EU Emissions Trading System?

Yes. One end is in the EU ETS area, so half the sea emissions count, plus emissions at the EU berth: about 618 tonnes of CO2, which means the same number of EU allowances to surrender.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy