Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

MR voyage: Singapore to Kwinana

A MR carrying 37,000 tonnes from Singapore to Kwinana sails about 2,334 nm laden via the Malacca Strait and Sunda Strait, about 7.8 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 19.3 days and burns about 376 tonnes of fuel.

Round voyage

19.3 d

7.8 d laden

Laden distance

2,334 nm

Shortest route

Fuel (VLSFO)

376 t

Round voyage

CO2

1,186 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Singapore → Kwinana

2,334 nm7.8187 t

Ballast

Kwinana → Singapore

2,334 nm7.5150 t

Port time

Loading and discharge

—4.040 t
Round voyage4,667 nm19.3376 t

Laden via the Malacca Strait and Sunda Strait; ballast via the Malacca Strait and Sunda Strait.

Emissions and EU ETS

The round voyage burns about 376 tonnes of VLSFO, emitting about 1,186 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
37,000 t
Laden speed
12.5 kn at 24 t/day
Ballast speed
13 kn at 20 t/day
Port time
4 days at 10 t/day
Laden draft
12 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a MR take from Singapore to Kwinana?

About 7 days 19 hours laden at 12.5 knots over 2,334 nm via the Malacca Strait and Sunda Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 19.3 days.

How much fuel does a MR burn on this voyage?

About 376 tonnes of VLSFO for the round voyage (187 t laden, 150 t ballast, 40 t in port), emitting about 1,186 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy