Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: Texas City to Chiba

A Aframax carrying 80,000 tonnes from Texas City to Chiba sails about 9,320 nm laden via the Panama Canal, about 31.1 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 64.9 days and burns about 1,912 tonnes of fuel.

Round voyage

64.9 d

31.1 d laden

Laden distance

9,320 nm

Shortest route

Fuel (VLSFO)

1,912 t

Round voyage

CO2

6,024 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Texas City → Chiba

9,320 nm31.11,025 t

Ballast

Chiba → Texas City

9,320 nm29.9807 t

Port time

Loading and discharge

—4.080 t
Round voyage18,640 nm64.91,912 t

Laden via the Panama Canal; ballast via the Panama Canal.

Emissions and EU ETS

The round voyage burns about 1,912 tonnes of VLSFO, emitting about 6,024 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from Texas City to Chiba?

About 31 days 2 hours laden at 12.5 knots over 9,320 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 64.9 days.

How much fuel does a Aframax burn on this voyage?

About 1,912 tonnes of VLSFO for the round voyage (1,025 t laden, 807 t ballast, 80 t in port), emitting about 6,024 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy