Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Texas City to Mailiao

A VLCC carrying 270,000 tonnes from Texas City to Mailiao sails about 14,689 nm laden via the Cape of Good Hope and Sunda Strait, about 49.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 86.6 days and burns about 4,347 tonnes of fuel.

Round voyage

86.6 d

49.0 d laden

Laden distance

14,689 nm

Via the Cape (avoiding both Suez and Panama)

Fuel (VLSFO)

4,347 t

Round voyage

CO2

13,698 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Texas City → Mailiao

14,689 nm49.02,693 t

Ballast

Mailiao → Texas City

10,499 nm33.71,514 t

Port time

Loading and discharge

—4.0140 t
Round voyage25,188 nm86.64,347 t

Laden via the Cape of Good Hope and Sunda Strait; ballast via the Panama Canal.

A laden VLCC draws about 22.5 m, deeper than the Panama Canal's 15.2 m limit, so the laden leg takes a longer route: via the Cape (avoiding both Suez and Panama).

Emissions and EU ETS

The round voyage burns about 4,347 tonnes of VLSFO, emitting about 13,698 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Texas City to Mailiao?

About 48 days 23 hours laden at 12.5 knots over 14,689 nm via the Cape of Good Hope and Sunda Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 86.6 days.

How much fuel does a VLCC burn on this voyage?

About 4,347 tonnes of VLSFO for the round voyage (2,693 t laden, 1,514 t ballast, 140 t in port), emitting about 13,698 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy