Voyage estimate
Suezmax voyage: Texas City to Yeosu
A Suezmax carrying 130,000 tonnes from Texas City to Yeosu sails about 14,189 nm laden via the Strait of Gibraltar, Suez Canal, Bab-el-Mandeb and Malacca Strait, about 47.3 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 83.2 days and burns about 3,043 tonnes of fuel.
Round voyage
83.2 d
47.3 d laden
Laden distance
14,189 nm
Avoiding the Panama Canal
Fuel (VLSFO)
3,043 t
Round voyage
CO2
9,590 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Texas City → Yeosu | 14,189 nm | 12.5 kn | 47.3 | 1,892 t |
Ballast Yeosu → Texas City | 9,941 nm | 13 kn | 31.9 | 1,051 t |
Port time Loading and discharge | — | — | 4.0 | 100 t |
| Round voyage | 24,130 nm | 83.2 | 3,043 t |
Laden via the Strait of Gibraltar, Suez Canal, Bab-el-Mandeb and Malacca Strait; ballast via the Panama Canal.
A laden Suezmax draws about 17 m, deeper than the Panama Canal's 15.2 m limit, so the laden leg takes a longer route: avoiding the Panama Canal.
Emissions and EU ETS
The round voyage burns about 3,043 tonnes of VLSFO, emitting about 9,590 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 130,000 t
- Laden speed
- 12.5 kn at 40 t/day
- Ballast speed
- 13 kn at 33 t/day
- Port time
- 4 days at 25 t/day
- Laden draft
- 17 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a Suezmax take from Texas City to Yeosu?
About 47 days 7 hours laden at 12.5 knots over 14,189 nm via the Strait of Gibraltar, Suez Canal, Bab-el-Mandeb and Malacca Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 83.2 days.
How much fuel does a Suezmax burn on this voyage?
About 3,043 tonnes of VLSFO for the round voyage (1,892 t laden, 1,051 t ballast, 100 t in port), emitting about 9,590 tonnes of CO2.