Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Suezmax voyage: Ust-Luga to Aliaga

A Suezmax carrying 130,000 tonnes from Ust-Luga to Aliaga sails about 4,235 nm laden via the Dover Strait and Strait of Gibraltar, about 14.1 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 31.7 days and burns about 1,112 tonnes of fuel.

Round voyage

31.7 d

14.1 d laden

Laden distance

4,235 nm

Shortest route

Fuel (VLSFO)

1,112 t

Round voyage

CO2

3,505 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Ust-Luga → Aliaga

4,235 nm14.1565 t

Ballast

Aliaga → Ust-Luga

4,235 nm13.6448 t

Port time

Loading and discharge

—4.0100 t
Round voyage8,469 nm31.71,112 t

Laden via the Dover Strait and Strait of Gibraltar; ballast via the Dover Strait and Strait of Gibraltar.

Emissions and EU ETS

The round voyage burns about 1,112 tonnes of VLSFO, emitting about 3,505 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
130,000 t
Laden speed
12.5 kn at 40 t/day
Ballast speed
13 kn at 33 t/day
Port time
4 days at 25 t/day
Laden draft
17 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Suezmax take from Ust-Luga to Aliaga?

About 14 days 3 hours laden at 12.5 knots over 4,235 nm via the Dover Strait and Strait of Gibraltar. The full round voyage, with the ballast leg back and 4 days in port, takes about 31.7 days.

How much fuel does a Suezmax burn on this voyage?

About 1,112 tonnes of VLSFO for the round voyage (565 t laden, 448 t ballast, 100 t in port), emitting about 3,505 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy