Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: Vancouver to Yeosu

A Aframax carrying 80,000 tonnes from Vancouver to Yeosu sails about 5,107 nm laden on the open-sea route, about 17.0 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 37.4 days and burns about 1,084 tonnes of fuel.

Round voyage

37.4 d

17.0 d laden

Laden distance

5,107 nm

Shortest route

Fuel (VLSFO)

1,084 t

Round voyage

CO2

3,415 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Vancouver → Yeosu

5,107 nm17.0562 t

Ballast

Yeosu → Vancouver

5,107 nm16.4442 t

Port time

Loading and discharge

—4.080 t
Round voyage10,214 nm37.41,084 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 1,084 tonnes of VLSFO, emitting about 3,415 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from Vancouver to Yeosu?

About 17 days 1 hour laden at 12.5 knots over 5,107 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 37.4 days.

How much fuel does a Aframax burn on this voyage?

About 1,084 tonnes of VLSFO for the round voyage (562 t laden, 442 t ballast, 80 t in port), emitting about 3,415 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy