Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: Esmeraldas to Philadelphia

A Aframax carrying 80,000 tonnes from Esmeraldas to Philadelphia sails about 2,448 nm laden via the Panama Canal, about 8.2 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 20.0 days and burns about 561 tonnes of fuel.

Round voyage

20.0 d

8.2 d laden

Laden distance

2,448 nm

Shortest route

Fuel (VLSFO)

561 t

Round voyage

CO2

1,768 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Esmeraldas → Philadelphia

2,448 nm8.2269 t

Ballast

Philadelphia → Esmeraldas

2,448 nm7.8212 t

Port time

Loading and discharge

—4.080 t
Round voyage4,896 nm20.0561 t

Laden via the Panama Canal; ballast via the Panama Canal.

Emissions and EU ETS

The round voyage burns about 561 tonnes of VLSFO, emitting about 1,768 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from Esmeraldas to Philadelphia?

About 8 days 4 hours laden at 12.5 knots over 2,448 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 20.0 days.

How much fuel does a Aframax burn on this voyage?

About 561 tonnes of VLSFO for the round voyage (269 t laden, 212 t ballast, 80 t in port), emitting about 1,768 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy