Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Suezmax voyage: Esmeraldas to Sikka

A Suezmax carrying 130,000 tonnes from Esmeraldas to Sikka sails about 12,185 nm laden via the Strait of Magellan, about 40.6 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 76.0 days and burns about 2,760 tonnes of fuel.

Round voyage

76.0 d

40.6 d laden

Laden distance

12,185 nm

Avoiding the Panama Canal

Fuel (VLSFO)

2,760 t

Round voyage

CO2

8,698 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Esmeraldas → Sikka

12,185 nm40.61,625 t

Ballast

Sikka → Esmeraldas

9,793 nm31.41,036 t

Port time

Loading and discharge

—4.0100 t
Round voyage21,978 nm76.02,760 t

Laden via the Strait of Magellan; ballast via the Panama Canal, Strait of Gibraltar, Suez Canal and Bab-el-Mandeb.

A laden Suezmax draws about 17 m, deeper than the Panama Canal's 15.2 m limit, so the laden leg takes a longer route: avoiding the Panama Canal.

Emissions and EU ETS

The round voyage burns about 2,760 tonnes of VLSFO, emitting about 8,698 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
130,000 t
Laden speed
12.5 kn at 40 t/day
Ballast speed
13 kn at 33 t/day
Port time
4 days at 25 t/day
Laden draft
17 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Suezmax take from Esmeraldas to Sikka?

About 40 days 15 hours laden at 12.5 knots over 12,185 nm via the Strait of Magellan. The full round voyage, with the ballast leg back and 4 days in port, takes about 76.0 days.

How much fuel does a Suezmax burn on this voyage?

About 2,760 tonnes of VLSFO for the round voyage (1,625 t laden, 1,036 t ballast, 100 t in port), emitting about 8,698 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy