Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

VLCC voyage: Georgetown to Ningbo

A VLCC carrying 270,000 tonnes from Georgetown to Ningbo sails about 12,572 nm laden via the Sunda Strait, about 41.9 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 79.0 days and burns about 3,934 tonnes of fuel.

Round voyage

79.0 d

41.9 d laden

Laden distance

12,572 nm

Avoiding the Panama Canal

Fuel (VLSFO)

3,934 t

Round voyage

CO2

12,398 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Georgetown → Ningbo

12,572 nm41.92,305 t

Ballast

Ningbo → Georgetown

10,328 nm33.11,490 t

Port time

Loading and discharge

—4.0140 t
Round voyage22,900 nm79.03,934 t

Laden via the Sunda Strait; ballast via the Panama Canal.

A laden VLCC draws about 22.5 m, deeper than the Panama Canal's 15.2 m limit, so the laden leg takes a longer route: avoiding the Panama Canal.

Emissions and EU ETS

The round voyage burns about 3,934 tonnes of VLSFO, emitting about 12,398 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
270,000 t
Laden speed
12.5 kn at 55 t/day
Ballast speed
13 kn at 45 t/day
Port time
4 days at 35 t/day
Laden draft
22.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a VLCC take from Georgetown to Ningbo?

About 41 days 22 hours laden at 12.5 knots over 12,572 nm via the Sunda Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 79.0 days.

How much fuel does a VLCC burn on this voyage?

About 3,934 tonnes of VLSFO for the round voyage (2,305 t laden, 1,490 t ballast, 140 t in port), emitting about 12,398 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy