Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

LR2 voyage: Jamnagar to Mombasa

A LR2 carrying 75,000 tonnes from Jamnagar to Mombasa sails about 2,433 nm laden on the open-sea route, about 8.1 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 19.9 days and burns about 558 tonnes of fuel.

Round voyage

19.9 d

8.1 d laden

Laden distance

2,433 nm

Shortest route

Fuel (VLSFO)

558 t

Round voyage

CO2

1,759 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Jamnagar → Mombasa

2,433 nm8.1268 t

Ballast

Mombasa → Jamnagar

2,433 nm7.8211 t

Port time

Loading and discharge

—4.080 t
Round voyage4,865 nm19.9558 t

Laden on the open-sea route; ballast on the open-sea route.

Emissions and EU ETS

The round voyage burns about 558 tonnes of VLSFO, emitting about 1,759 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
75,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
13.8 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a LR2 take from Jamnagar to Mombasa?

About 8 days 3 hours laden at 12.5 knots over 2,433 nm on the open-sea route. The full round voyage, with the ballast leg back and 4 days in port, takes about 19.9 days.

How much fuel does a LR2 burn on this voyage?

About 558 tonnes of VLSFO for the round voyage (268 t laden, 211 t ballast, 80 t in port), emitting about 1,759 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy