Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

Aframax voyage: Jose to Ningbo

A Aframax carrying 80,000 tonnes from Jose to Ningbo sails about 9,829 nm laden via the Panama Canal, about 32.8 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 68.3 days and burns about 2,012 tonnes of fuel.

Round voyage

68.3 d

32.8 d laden

Laden distance

9,829 nm

Shortest route

Fuel (VLSFO)

2,012 t

Round voyage

CO2

6,339 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Jose → Ningbo

9,829 nm32.81,081 t

Ballast

Ningbo → Jose

9,829 nm31.5851 t

Port time

Loading and discharge

—4.080 t
Round voyage19,657 nm68.32,012 t

Laden via the Panama Canal; ballast via the Panama Canal.

Emissions and EU ETS

The round voyage burns about 2,012 tonnes of VLSFO, emitting about 6,339 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
80,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
14.5 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a Aframax take from Jose to Ningbo?

About 32 days 18 hours laden at 12.5 knots over 9,829 nm via the Panama Canal. The full round voyage, with the ballast leg back and 4 days in port, takes about 68.3 days.

How much fuel does a Aframax burn on this voyage?

About 2,012 tonnes of VLSFO for the round voyage (1,081 t laden, 851 t ballast, 80 t in port), emitting about 6,339 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy