Voyage estimate
VLCC voyage: Ju'aymah to Kiire
A VLCC carrying 270,000 tonnes from Ju'aymah to Kiire sails about 6,166 nm laden via the Strait of Hormuz and Malacca Strait, about 20.6 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 44.3 days and burns about 2,160 tonnes of fuel.
Round voyage
44.3 d
20.6 d laden
Laden distance
6,166 nm
Shortest route
Fuel (VLSFO)
2,160 t
Round voyage
CO2
6,806 t
Outside EU ETS
Round voyage breakdown
| Leg | Distance | Speed | Days | Fuel |
|---|---|---|---|---|
Laden Ju'aymah → Kiire | 6,166 nm | 12.5 kn | 20.6 | 1,130 t |
Ballast Kiire → Ju'aymah | 6,166 nm | 13 kn | 19.8 | 889 t |
Port time Loading and discharge | — | — | 4.0 | 140 t |
| Round voyage | 12,332 nm | 44.3 | 2,160 t |
Laden via the Strait of Hormuz and Malacca Strait; ballast via the Strait of Hormuz and Malacca Strait.
Emissions and EU ETS
The round voyage burns about 2,160 tonnes of VLSFO, emitting about 6,806 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.
Assumptions
- Cargo
- 270,000 t
- Laden speed
- 12.5 kn at 55 t/day
- Ballast speed
- 13 kn at 45 t/day
- Port time
- 4 days at 35 t/day
- Laden draft
- 22.5 m
- CO2 factor
- 3.151 t per t fuel
Other ship sizes on this route
Questions
How long does a VLCC take from Ju'aymah to Kiire?
About 20 days 13 hours laden at 12.5 knots over 6,166 nm via the Strait of Hormuz and Malacca Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 44.3 days.
How much fuel does a VLCC burn on this voyage?
About 2,160 tonnes of VLSFO for the round voyage (1,130 t laden, 889 t ballast, 140 t in port), emitting about 6,806 tonnes of CO2.