Pro account is available for free now, Platform launching Q1 2027.Sign up

Vessbook

Voyage estimate

LR2 voyage: Onsan to Yangon

A LR2 carrying 75,000 tonnes from Onsan to Yangon sails about 3,799 nm laden via the Malacca Strait, about 12.7 days at 12.5 knots. With the ballast leg back and 4 days in port, the round voyage takes about 28.8 days and burns about 827 tonnes of fuel.

Round voyage

28.8 d

12.7 d laden

Laden distance

3,799 nm

Shortest route

Fuel (VLSFO)

827 t

Round voyage

CO2

2,605 t

Outside EU ETS

Round voyage breakdown

LegDistanceDaysFuel

Laden

Onsan → Yangon

3,799 nm12.7418 t

Ballast

Yangon → Onsan

3,799 nm12.2329 t

Port time

Loading and discharge

—4.080 t
Round voyage7,598 nm28.8827 t

Laden via the Malacca Strait; ballast via the Malacca Strait.

Emissions and EU ETS

The round voyage burns about 827 tonnes of VLSFO, emitting about 2,605 tonnes of CO2. Neither port is in the EU ETS area, so no EU allowances are needed for this voyage.

Assumptions

Cargo
75,000 t
Laden speed
12.5 kn at 33 t/day
Ballast speed
13 kn at 27 t/day
Port time
4 days at 20 t/day
Laden draft
13.8 m
CO2 factor
3.151 t per t fuel

Other ship sizes on this route

Questions

How long does a LR2 take from Onsan to Yangon?

About 12 days 16 hours laden at 12.5 knots over 3,799 nm via the Malacca Strait. The full round voyage, with the ballast leg back and 4 days in port, takes about 28.8 days.

How much fuel does a LR2 burn on this voyage?

About 827 tonnes of VLSFO for the round voyage (418 t laden, 329 t ballast, 80 t in port), emitting about 2,605 tonnes of CO2.

Terms on this page

We use cookies

Essential cookies keep you signed in. Analytics and marketing are optional. Cookie Policy